Kanav, here's the work

We went through more than 30 of your talks and episodes, from your 2011 graduation speech to the a16z panel in October, most of The Punch List, and your posts. This is what we'd start with.

The idea: build every building like a data center

America can still build fast, and data centers prove it every month. What they have that hospitals, homes and offices don't is decisions: made early, made once, and owned by one team.

Everything else plans the other way. On your own projects, a change takes six to eight weeks to answer. In Dubai, everyone knows the early budget will end up 50% over, and nobody wants to say so first.

This autumn makes it the right time to say it out loud. Data center spending nearly doubled to $96.5 billion while the rest of construction shrank, and contractors without data center work just saw their backlog fall to 7.6 months. Costs rose 13.3% this year while what builders can charge rose 5.5%. The industry is about to find out whether it learned anything from building fast.

You've already started saying this on The Punch List. We'd make it the thing you're known for.

Four posts, ready for your edits

1Jensen Huang said last year it takes about three years to build a data center in America. I know three general contractors who built theirs in 11, 12 and 14 months.

Jensen Huang said last year it takes about three years to build a data center in America. I know three general contractors who built theirs in 11, 12 and 14 months.

You'd guess they had more workers than everyone else. If anything they had it harder, because a data center needs a lot more electricians than most buildings, and there aren't enough to go around.

What they asked for was control: "Give me control over design. And give me control over subcontractors." Instead of bidding out every trade five ways, they brought in subs they had worked with before and already knew how to coordinate with.

So most of the speed was decided before anyone broke ground. One team owned the drawings and the people building from them, so when something didn't fit, the people who had to live with the answer could settle it quickly.

On most buildings, that same problem has to travel between an architect, a few engineers, a general contractor and a long list of subcontractors, and every answer reopens someone else's plan. I'm an owner on two projects myself, and every change I ask about takes six to eight weeks to come back.

At MeltPlan, we're building towards letting any team check a change against the code, the cost and the schedule in a day instead of six weeks.

Whatever we're learning from building data centers this fast should be used on every other kind of building. We need to ship things fast.

From your Punch List episode on construction speed, 22 October.

2Almost every owner I meet has a story about a contractor who went over budget. Very few of those stories start with the contractor.

Almost every owner I meet has a story about a contractor who went over budget. Very few of those stories start with the contractor.

I had one too. When my wife and I remodeled our house in Berkeley, the budget and the timeline both ran 50% over. I thought I'd been unlucky, so I asked around. My friends told me I'd done fine.

That's when I started digging. Most budgets get set before anyone has the full picture, on drawings that aren't finished and will change. Then every change has to travel through the architect, the engineers and every trade involved, and each one adds cost the first number never had.

So by the time the contractor is building, a lot of the overrun is already baked in. My co-founder TK ran construction projects for years, and he puts it bluntly: "You can screw things up in ops, but you're never gonna perform better than what pre-construction gave you."

Contractors do owe owners one thing, and that's the honest number before anyone signs, even when a lower one would win the job. When I was in Dubai this year, everyone in the industry seemed to know the early budget would end up around 50% over, and nobody wanted to be the first to say so.

That's why we built MeltPlan around the planning, before anyone breaks ground.

So if I'm the owner, I'd rather hear the honest number before I sign and spend the extra weeks on the plan than blame the builder halfway through.

From your Berkeley remodel, TK on pre-construction, and your read of Dubai.

3"When are you leaving tonight?"

"When are you leaving tonight?"

That's what our hospital customer in Iowa asked when my team flew in, back when I was building my last company, Innovaccer. They had just seen our first prototype, hated it, and given us three months to fix it.

I told them we were staying. We camped there for those three months. One night the police came into the administrative offices at 4 a.m. because they couldn't work out why the lights were on, and I had to explain that I was working there.

When they first asked us to build it, we had no idea what it even meant. In those three months we learned it in their office, five layers deep, and by the end they offered to set up an automatic monthly wire to us instead of waiting for our invoices.

They were surprised anyone stayed. The biggest health systems get vendors flying in all the time. Who shows up in Des Moines and stays?

I think the same is true in construction today. The middle of the market, the thousands of contractors outside the top 400, rarely gets anyone who sits with their real problem. So that's where we spend our time at MeltPlan, and before a first call I ask contractors to send us drawings from one of their past projects.

I still think the most important thing in selling to businesses is being honest with yourself about whether you really understand the customer's problem.

From your Innovaccer years: Lightspeed and TiECON.

4The things that go into new hospitals, clinics and other health care buildings cost 12.1% more than they did a year ago. What builders charge for them went up 6%.

The things that go into new hospitals, clinics and other health care buildings cost 12.1% more than they did a year ago. What builders charge for them went up 6%.

Those are the government's price numbers, out last week. Yet the latest contractor survey found builders more hopeful about their profit margins than a month earlier.

If you signed a fixed-price job last fall, you're now buying this year's steel and copper out of last year's number. Steel mill products are up 32.9% and diesel 115%, and that gap comes straight out of the margin.

Back in May, I said every pre-con room would start adding 10% for unknowns. The trouble is that prices haven't moved evenly. Ready-mix concrete is up 2.4% and gypsum is actually down.

A blanket 10% overprices a lot of your bid and may still come up short on the steel. And when more than half of contractors had a project cancelled, postponed or scaled back in the six months to August, a padded number is an easy way to lose the job.

So I'd be surgical about it. Look at what's heavy to ship, what's imported and what takes a lot of energy to make, and put the padding on those lines.

I'd want every escalation allowance in a bid to name the material it's for.

From last week's producer price numbers and what you said on The Punch List in May.

Twenty more, already written

Ten more for you, each from your own tape: owners now running a contractor's bid through Claude (your backyard gym and the missing paint), why pre-construction needs compilers, the floor-plan test for any fast schedule, the shadow AI committee, the 3,000-question inspector exam, your first sale with no human in it, and four more.

Ten for TK, from his 18 years as a builder: ordering his own rebar on power plants, the Ctrl C, Ctrl V details he later had to build, the superintendent who belongs in pre-con, why padding and risk are different things, the job he kept on budget through tariffs and COVID, and five more.

Read your ten ยท Read TK's ten

Stories you've told on stage that LinkedIn hasn't heard

December, on us

If this feels like you, reply to my note and we'll start the first week of December.

Nitesh